The upcoming Vincent Thomas Bridge closure could significantly disrupt manufacturers, distributors and companies moving goods through Southern California. In this Supply Chain Byte, Lisa Anderson discusses why the 16-month closure matters for supply chains connected to the San Pedro Bay port complex. With fewer routing options and increased pressure on alternate routes, companies should not wait until the disruption begins to plan.
The key is preparation. Manufacturers and distributors should consider prepositioning inventory, reassessing their supply chain networks, developing contingency plans and increasing supply chain visibility so they can anticipate issues before they affect customers.
The Vincent Thomas Bridge connects the San Pedro Port complex with the Southern California region. Once it shuts down in November, trucks will have to use a 2-lane bridge or, in essence, go through the Long Beach Port complex. Thus, both ports and the entire region will be impacted. There will be many impacts including delays, extension in lead times, increased truck miles and associated costs, congestion throughout the region, reduced predictability in drayage schedules, increased need in truck capacity and associated costs, and delays.
How Should You Prepare?
If you don’t prepare, your customers and costs will be negatively impacted. Start by ordering excess inventory early – it might be too late but do whatever you can to increase your safety stock to accommodate for disruptions and delays in supply. Protecting your customers’ needs should be of utmost importance.
However, simply increasing safety stock will not suffice. This issue will be around for a minimum of 16 months although you should plan for at least 20% longer. Reevaluate your routes and be prepared to pivot. For example, if you bring products from China and India through the Southern California ports, you are likely evaluating bringing at least a portion of your goods through the Panama Canal to the East Coast ports, assuming your customers are a typical distribution of the United States. That would reduce the dependence on the West Coast ports as there are no reasonable viable alternatives for most container shipments and diversify risk while, most likely, keeping costs closely aligned. This will become even more popular as companies diversify from China as it typically makes the transit to the East Coast ports more reasonable.
Proactive companies will focus on utilizing transportation planning (TMS) for dynamic routing – and re-routing with delays and disruptions, leveraging SIOP (Sales Inventory Operations Planning) to determine how to optimize and position inventory and reallocate capacity (manufacturing, logistics/ warehousing, transportation) in your network, leaning on advanced planning (APS) systems to perform contingency planning and run scenarios, and collaborate proactively with customers and partners to plan your end-to-end supply chain needs together.