Turning Data Into Action to Improve Warehouse Performance

As Jenson USA continued to grow, the increasing number of order picks, product sizes, and inventory volatility with demand shifts and closeout opportunities created new challenges around warehouse space, productivity, inventory management, and freight costs. With approximately 45,000 active SKUs ranging from small components to complete bicycles, the company needed to improve operational efficiency while creating greater visibility into performance.

Jenson USA partnered with LMA Consulting Group to dig into the data and work side by side with its team to identify opportunities and turn information into action. In this customer testimonial, Mauro Megalo, Director of Operations at Jenson USA, discusses how the collaboration helped improve picking and labor productivity, automate reporting, strengthen operational visibility, and identify significant freight savings.

The Challenge: Supporting Growth Within a Complex Warehouse

Jenson is an e-commerce operation with tens of thousands of SKUs which requires different strategies than a traditional distribution environment. Since products vary dramatically in size, velocity, storage requirements, and handling needs, the organization, storage and warehousing strategies had to reflect these differences. Most importantly, 80% of the volume was in a small number of skus with a significant long-tail of items with low demand and infrequent picks. Thus, Jenson decided to bring on supply chain consultants to partner with the team to design the most efficient and effective layout, flow, processes, and use of systems to best support customer successful while maximizing efficiencies and profitability. They also wanted to develop the right metrics to manage performance. 

As Jenson USA Director of Operations Mauro Megalo explained, growth was creating significant pressure around both space and productivity. The less space available, the less efficient the operations become in moving products around the warehouse. LMA worked with Mauro and his team to evaluate warehouse operations from end to end, including forecasting, receiving, putaway, replenishment, order picking, inventory management, bike build, packing and shipping, freight, labor, and operational metrics.

Optimizing Inventory Placement and Warehouse Flow

The team identified one of the largest opportunities was commonsense yet powerful: store the products that make up 80% of the picks closest to the dock doors to minimize movements. Although not rocket science, it was easier said than done. LMA gathered data from their ERP, WMS and freight systems, analyzed inventory velocity, storage requirements, warehouse zones, forecast requirements, and picking activity to identify which SKUs should be positioned in the most accessible warehouse locations. The analysis showed that approximately 80% of volume was concentrated in roughly 1,500 SKUs which equated to around 5% of the items. Thus, there was a valuable opportunity to reorganize and prioritize the products that move frequently in Zone A to minimize movements and maximize efficiencies. 

The key to success was determining whether the skus that relate to the top 80% of the volume what would fit in Zone A. With multiple product sizes and dimensions, storage containers and slots, significant numbers of skus and product movement, and the lack of complete data, developing a sales forecast and translating that into location sizes and zones required significant systems integration, data analysis and immense number crunching. The answer was clear – the top 80% of the items would fit in Zone A if we moved other items out. 

LMA and Jenson developed a plan to move high-velocity inventory to Zone A to reduce travel time, improve pick paths, and position long-tail inventory farther away from the dock doors. The results were significant. At the beginning of the initiative, approximately 47% of picks came from Zone A. By the end of the project, that had increased to over 60%, with the team continuing toward an 80% goal for key items.

“We were able to increase productivity about 20% just within those couple processes there. So, that’s a very big win for us.”

The improvement translates into a minimum of $60,000 in annual labor productivity value, while also creating a more efficient foundation for future growth.

Turning Operational Data into Action

Improving warehouse performance required more than reorganizing inventory. Jenson also had substantial operational data from its ERP and execution systems, but collecting and interpreting that information required significant manual effort. As Mauro described it, the data was “pretty muddy.” An employee was spending hours gathering information and compiling notes. Therefore, instead of focusing on improving processes, the team was bogged down in gathering data. There was a plethora of reports but not an easy way to determine what the data meant and what should be done about it.

LMA helped the team prioritize, categorize and structure the information to gain meaningful KPIs. And, equally important, LMA worked with their IT and technical resources to transition manual reporting into automated Power BI reports and dashboards. They also provided the rules and guidelines for the data model they created to analyze data. 

“Instead of having somebody sit down for hours on end collecting this, it’s now at our fingertips and it allows us to spend our time looking for root causes instead of just collecting the data.”

That shift was transformative. Data itself is not valuable. In fact, it was overwhelming the team as they were swimming in details without gaining insights. After the upgrade and transition, the team turned data into insights. Moving from reactive firefighting to proactive strategies, the team used timely information to identify exceptions, determine root causes, and take corrective action.

Reducing Inventory-Related Waste

Improved visibility also allowed the team to focus on the causes of inventory adjustments and operational waste. LMA worked with Operations and Finance to categorize transactions and develop reporting around inventory errors and manufacturing issues. As a part of the process, they identified key drivers for production related errors, quality control issues, and shipping discrepancies. The team established additional quality checks, rolled out training and tracking tools, and upgraded processes to address root causes.

Those efforts generated measurable improvement. Inventory adjustments related to manufacturing issues for January through May 2026 declined 53% compared with the same period in 2025. As Mauro noted, the team was no longer simply gathering information. They were putting the reports to work and seeing meaningful reductions in warehouse cost and waste.

Finding Immediate Freight Savings

Freight provided another significant opportunity. LMA partnered with Jenson and external freight consultants to analyze shipping volumes, carriers, rates, and service requirements and identified several opportunities. For example, there was an opportunity to shift package volume between carriers. By working with the carriers and changing the freight mix, Jenson reduced freight spend by approximately $5,000–$5,500 per month. They collaborated with Claude to run scenarios through the model and confirmed that a minimum of $5000 was expected to continue as shipments transitioned to the improved rate structure.

But carrier rates were only part of the opportunity. LMA and Jenson also analyzed shipping charges for bikes and expedited next-day and two-day shipments. The analysis uncovered a gap between what Jenson was paying its carriers and what customers were being charged. The difference had resulted in approximately $20,000–$21,000 in losses over roughly six months. Once the issue was identified, Jenson adjusted its shipping charges to better reflect actual freight costs, significantly reducing the loss and creating a more sustainable approach going forward.

Building a More Scalable Operation

The operational improvements extended beyond immediate cost savings. LMA developed a sales and operations (SIOP, also known as S&OP) forecast incorporating historical shipments, annual growth, open purchase orders, and on-hand inventory to calculate projected SKU usage. This gave Jenson greater visibility into future inventory and space requirements and provided a stronger foundation for replenishment, warehouse planning, and labor decisions. LMA created a data model to run scenario analysis for storage and labor efficiencies and transitioned the formulas to the IT team so that they could develop into their sustainable systems infrastructure. 

The team also evaluated warehouse capacity and automation opportunities to determine how Jenson could support continued sales growth within its existing footprint. LMA put together an analysis that showed how Jenson could meet their revenue plans with the estimated investments and payback. The objective was not simply to solve today’s warehouse issues. It was to create processes, tools, and visibility that would allow the operation to scale as the business grows.

The Results

Through its partnership with LMA Consulting Group, Jenson USA achieved measurable improvements across warehouse operations, inventory, data visibility, and freight:

  • Increased Zone A picks from 47% to 60% in the first few months of the new process
  • Improved picking productivity by approximately 20%
  • Generated approximately $60,000 in annual labor productivity value
  • Positioned high-velocity inventory closer to packing and shipping
  • Reduced travel time and improved warehouse flow
  • Automated operational reporting and reduced hours of manual data collection
  • Improved visibility into root causes of inventory adjustments and operational issues
  • Reduced inventory adjustments related to manufacturing issues by 53% year over year for the January–May period
  • Reduced freight expense by approximately $5,000–$5,500 per month through carrier optimization
  • Identified and addressed approximately $20,000–$21,000 in shipping-charge losses
  • Improved forecasting to support inventory, storage, replenishment, and labor planning

Most importantly, Jenson gained actionable information and practical processes its leadership team can continue using to drive improvement.

Operational Visibility Drives Profitable Growth

For distributors and e-commerce companies, growth can quickly expose weaknesses in warehouse layout, inventory strategy, labor productivity, forecasting, and freight management. The answer isn’t necessarily more space, more people, or more systems. 

Frequently, the greatest opportunities come from using existing data more effectively, positioning inventory based on demand, eliminating unnecessary activity, improving visibility, and focusing the team on root causes. For Jenson USA, that approach delivered measurable productivity improvements and cost savings while creating a stronger operational foundation for growth. And the impact went beyond the numbers.

“They challenged us and made us look at things differently and it probably brought the best out of me and my leadership team.”

Mauro added that his team still asks, “What would Diane and Lisa do?” when evaluating operational challenges.

That ability to continue applying the processes, tools, and thinking long after an engagement is complete is what turns operational improvement into sustainable results.

 